Page 1 of 1

Surface Pond Spill- Freeboard

Posted: Wed Jun 05, 2019 11:03 am
by Lincoln
Please add the capability for the user to enter a freeboard height (i.e., typically 1 ft), then have the routine return the volumes for the brim full spill elevation and the volume at the freeboard elevation (i.e. typically 1 ft below brim full spill elevation).